EOSS is well-known and respected in the UAE marketplace as both a professional and reputable service provider. EOSS is also considered an unparalleled leader in the field of structured cabling and patch cord provision in the UAE.Following are relevant ongoing and completed projects. 

     

Project Name  : Zubair Oilfield Development Project

Location          : Basra, Iraq

Client              : ENI & Weatherford

Date               : March 2014 – Ongoing

Description   :

Electrical and Instrumentation Hook up:-

•Cable Containment – More than 12 kms of electrical and instrumentation cable ladders, laid over PARS and sleepers.
•Earthing- More than 150 earthing pits and earthing rods, which has been installed and terminated with the earthing Grid, using CAD welding and crimping terminals.
•Power Distribution ( HV, LV, Control, Space heater, UPS) – More than 360 Kms of Power cables pulled over cable ladders and duct banks, including termination and final testing of all types of cables like Drum testing, HiPot testing, continuity and loop resistance testing.
•Instrumentation and Control- Pulling of 177 Kms of Control cables including termination and testing, between JBs and Field instruments from one side and LERSs and CCRs from the other side.
•Instrumentation Chemical injection and pneumatic tubing Installation of more than 3000 meters of chemincal injection tubing and 1000 meter of pneumatic tubing.
•CCTV Cameras and cabling – Installation of more than 40 outdoor CCTV cameras on poles for Perimeter security.
•PAGA Speakers and cabling -  Installation of more than 175 outdoor/indoor speakers on poles and ceiling in two Loops A &B, including termination and system testing.
•ICSS Cabling – Pulling, termination, testing of More than 6 kms of 32,24 and 4 core Fiber Optic cable for ICSS networks and CCTV application.
•Field Instruments and JB Cabling- Installation of Field instruments  including more than 475 guages, transmitters and manifolds, with the required supports, shades and labels.
•Fire and Gas System Installation – Installation of more than 300 Fire and gas detection equipment including call points, smoke detectors, IR detector, with the required support and labels.
•Street and Field Lighting:- Installation of more than 2100 lighting fixtures, including field lighting fixtures, poles and pipe racks fixtures and street flood lights (Single and Dual fixtures, over 12 meters Poles Height
•Installation of ship loose items – For skids and substations
 

Project Name  : Al Quoz DEWA Offices>

Location          : Al Quoz Office

The office is the largest government building in the world to have secured Leadership in Energy and Environmental Design (LEED) platinum rating for green buildings.

Client              : DEWA

Date               : March 2012 – October 2012

Description   : Supply, Installation and commissioning of the following systems:-

•Structured cabling system – With more than 3500 Points cable pulling, termination and testing
•Wireless Access points – Cable pulling, installation, testing and commissioning of more than 1000 Cisco wireless accessequipments and the related controllers.
•Access control equipment – Installation, testing and commissioning of S2 Based access control system controllers and Biometric Readers.
•CCTV Surveillance system – Cameras installation, configuration, soft focusing and commissioning of 50 Indoor cameras
•Queue Management system – Installation, testing and commissioning of a completely customized system for DEWA authorities with LED Units
•Public Address system – Installation of ceiling mount speakers and wall mount speakers in The Meeting room and mosque.

 

 

Project Name  : Senior Operation Staff accommodation camps

Location          : Asab, Buhasa, Habshan

Client              : ADCO

Date               : Jan 2013- May 2013

Description   : Supply, Installation, testing and commissioning of the complete Structured Cabling system and SMATV systems for Accommodation for personnel from ADCO, ADNOC and Gasco.

Asab and Buhasa: Provision of more than 1600 Data and Voice points based on Cat 6 Solution. Laying of more than 5 kms of Fiber optic cable and more than 500 termination.
EOSS has also provided a complete SMATV solution to more than 500 users in these Caravan accommodations.

PA System of more than 655 ceilings speakers were installed.

 

 

Project Name  : Baraka Unit Accomodation

Location          : UAE

Client              : Emirates Nuclear Energy Corporation

Date               : 2012-Ongoing

Description   : Supply, Installation, testing and commissioning of the complete

Structured Cabling system for accommodations. The systems installed were Data and Telephone, Wireless System as well as Satellite Master Antenna Television system. More than 1000 points of Data and Telephone Category 6 points installed points, alongwith the SMATV System outlets using RG6 and RJ11 Cables. Total Fiber Optic cable pulled was beyond 10 kms & more than 200 terminations.

 

 

Project Name  : Dubai International Airport Expansion Phase 2- Concourse 3 (AX 140)


Location          : Dubai

Client              : Thales International

Date               : 2011-2012

Description   : Installation and Commissioning of Structured Cabling Network and 48V DC System:

Fiber Optic System:

Fiber Optic Cable Installation of more than 760 Kms (Including 96, 36,24,18,12,6 and 2 Cores FO Cable Fiber Optic cable Termination, testing and commissioning of more than 50,000 cores (The biggest Fiber to Desk Installation)

Equipment Installation: Installation of Control Room Equipments and FO Outlet and FTTO Switches
Rack Installation: nstallation and arrangement of 96 Cabinets of size between 42U and 9U
Copper Cabling: Copper Cable Installation of 58 Kms (100 Pair, 50 Pair, 4 Pair and Cat5e, Cat 6)
Copper Cable termination and testing of more than 5500 Pairs
Power Cabling: Power Cable Installation 420 Kms
Power Cable Testing & Installation of 6942
Power Termination of 8000 FTTO Switches
Cabling

:  Various systems like SACS, CCTV, SCN, MATV, RADIO, WDN, IEVT, BHS, BMS, Interconnectivity etc.

 

Project Name  : Fiber Optic Services

Location          : UAE

Client              : EMAL, Borouge, Samsung, ADCO, Takreer, ADNOC, Shweihat Power Plant, Mirfa Power Company

Date               : 2011-Ongoing

Description   : Fiber Optic cable termination and testing at below locations:

EMAL: Termination and testing of 2500 cores
Shweihat S2- Termination and testing of 3000 cores
Shweihat S3- Termination and testing of 4200 cores
Borouge 3 Termination and testing of 920 cores
ADCO Habshan 5- Termination and testing of 200 cores
Gaso Ruwais Migration of telecom Facilities: Termination and testing of 2000 cores
ADNOC Distribution: Termination and testing of 700 cores

Mirfa Power Company- Termination and testing of 672 cores

 

 

Project Name  : Shah Gas Development – Saipem Accomodation


 

Location           : Shah, Abu Dhabi

Client               : Saipem

Date                : 2011- Ongoing

Description      :Supply, Installation, testing and commissioning of the complete Structured Cabling system for Senior Junior accommodations.

The systems installed were Data and Telephone as well as Satellite Master Antenna Television system. More than 2500 points of Data and Telephone Category 6 points installed points, alongwith the SMATV System outlets using RG6 and RJ11 Cables. Total Fiber Optic cable pulled was beyond 11.5 kms & more than 500 termination.

 

Project Name  : Dubai Metro


Location          : Dubai

Client              : Thales International

Date               : 2009 – 2011

Description     :  Installation and Commissioning of Low Voltage Systems including the following systems(CCTV system, IAS system, TDS system, TN-ECB system PAS-PIS system) in Dubai Metro Red line.

Each system consisting of the following:

Installation and Commissioning of Low Voltage Systems including the following systems(CCTV system, IAS system, TDS system, TN-ECB system PAS system, FON system) for both Jumeirah and Rashidiya carparks
Each system consisting of the following:

CCTV – installation of 998 outdoor IP (Pelco) cameras, 15,000 terminations of fiber at ODF, laying of 517,463 meters of fiber optic cable, SSTP Cat6 cable and power cable.
IAS – installation of 250 Door control module, proximity card reader and laying of 200,000 meters of power cable, SSTP Cat6 Ethernet cable and Belden cable.
TDS – installation of 30 central master clock and digital clock, laying and termination of 2000 meters GPS antenna cable, laying and termination of 333 meters of power cable.
TN-ECB – installation of 59 ECB, laying of 80,000 meters of twisted pair cable, termination of 800 telephone cables at socket.
PAS – installation of 3,086 loudspeakers, 87 ambient noise sensors, laying and termination of 137,284 meters of power cables.
FON – laying of 24,000 meters of 24 core fiber optic cable, and terminations of 4500 fiber at ODF.

 

 

Project Name  : Borouge II Expansion

Location          : Ruwais

Client              : Thales International

Date               : 2009 – 2010

Description     :  Supply and Installation of Structured Cabling System in Borouge II expansion,Survey, Cable pulling, Labeling, Termination and Testing of the Outside Plant Cabling System, Installation of Low voltage system including the following systems (PABX-Hot Line facilities, Public Address system, CCTV system, Master Clock system)

Our job consists of:

PABX-Hot Line Facilities–Installation, testing and commissioning of 7000 meters of 20p telephone cable, installation of 15 Analogue telephones, laying of 12,600 meters telephone cable and power cable

Public Address –Installation, testing and commissioning of 17 central equipments, pulling of 8,080 meters cable for loudspeakers, laying of 40,671 meters of 2pair telephone cable, fixation of 488 loudspeakers

CCTV – pulling of 10,800 meters of fiber optic cable and power cable, fixation, installation and testing of 100 CCTV cameras

OPC – Installation, testing and commissioning of 43,868 meters of 24 core fiber optic cable with testing and pulling of 12,050 meters of 12 core fiber optic cable and drum testing

 

 

 

Project Name: Officers Club


Location: Abu Dhabi

Client: Al Fahad Smart Systems

Date : April 2010- August 2010

Description         : Installation, termination, testing, labeling and commissioning of 858 indoor/outdoor IP Camera System (DC system)

Supply and Installation of 79 Intermediate Distribution Frames, 2 Optical Distribution frame along with 1 Main Distribution Frame
Installation of 20 kilometers of fiber optic cable and 60 kilometers of UTP Cat 6 Cable
Supply, installation of 18 Intermediate Distribution Frame
Installation, initial focusing and configuration of 142 IP Cameras
Supply, installation of 18 Intermediate Distribution Frame
Installation, initial focusing and configuration of 142 IP Cameras
Supply, installation of 43 Intermediate Distribution Frame

Installation, initial focusing and configuration of 611 IP Cameras